GMH
VODA Industrial — Capability Brief
Issue 01 · 2025 · Green Master Harvest Sdn Bhd
← All Presentations
GMH
Green Master HarvestSdn Bhd · 1079627-D
INDUSTRIAL & COMMERCIAL CAPABILITY BRIEF
ISSUE 01 · 2025
FOUNDER OF VODA · RAINWATER HARVESTING SYSTEMS
Every drop matters!

Engineered rainwater harvesting for factories, warehouses, and master-planned developments — designed around your site, measured against your meter.

PATENT MY-178044-A CIDB REGISTERED SPAN ENDORSED REHDA MEMBER
01 / 12 CAPABILITY BRIEF
GMH
Green Master Harvest
VODA
MAKER OF VODA
GMH · SDN BHD
SYSTEM OVERVIEW

How VODA works, who it serves, who we are.

STEP 01
COLLECT
Rainwater intercepted from existing roof downpipes via the VODA tapping collar — no new infrastructure required.
STEP 02
FILTER
VODA self-cleansing filter removes debris and contaminants — no manual cleaning, no servicing interval.
STEP 03
STORE
Filtered rainwater held in modular VODA tanks, sized to the structural, spatial, and access constraints of each site.
STEP 04
DISTRIBUTE
Stored rainwater delivered to non-potable end uses — WC flushing, landscape irrigation, general washing.
Fully gravity-driven at base configuration — no electricity, no pump, no energy cost.
Who we serve
  • Commercial shopping centres & retail
  • Corporate headquarters & offices
  • Industrial facilities & plants
  • Government & institutional buildings
  • Large-scale & mixed-use developments
What we do
  • Reduce mains water use & utility cost
  • Meet LEED, GBI & RWH compliance
  • Retrofit live buildings without disruption
  • In-house engineering, fabrication, install
  • Dual-meter audits; mains backup standard
Who we are
  • Founded 2012 by a Malaysian architect after a building plan was rejected for RWH non-compliance
  • Engineered a compact, gravity-driven alternative to bulky pump-dependent systems
  • Patent MY-178044-A granted; Green Master Harvest Sdn Bhd formed
  • SPAN · CIDB · REHDA · FMM
02 / 12
CAPABILITY BRIEF
GMH
Green Master Harvest
VODA
MAKER OF VODA
GMH · SDN BHD
CASE STUDY 01 · LARGE-SCALE COMMERCIAL RETROFIT

MyTOWN Shopping Centre, Cheras KL

Rainwater reuse for WC flushing — retrofit into an active operating building.

Project Context
Client
Large-scale commercial shopping centre, Cheras, Kuala Lumpur
Application
Rainwater reuse for WC flushing across the building
Project
Retrofit into an existing operating building
System Design
Architecture
Two-level — harvested at L7, integrated into WC mains at L7M1
RWDP
Existing downpipes preserved — original discharge path kept
Supply
Supplements domestic gravity supply via VSD booster pump
Storage
6 × 760 L VODA Cylinder · 4.56 m³
Performance & Audit
Method
Dual-meter audit — WM2 (total outlet) minus WM1 (mains backup) = rainwater delivered
Reporting
Verifiable savings with full audit trail for sustainability reporting
Backup
Mains water connected as automatic backup — supply never interrupted
03 / 12
CAPABILITY BRIEF
GMH
Green Master Harvest
VODA
MAKER OF VODA
GMH · SDN BHD
CASE STUDY 02 · CORPORATE HEADQUARTERS

Wisma Shell, Cyberjaya

Rainwater reuse for landscaping & WC flushing — high-visibility corporate environment.

Project Context
Client
Corporate headquarters, Cyberjaya
Application
Rainwater reuse for landscaping and toilet flushing
Project
Integration into an active, high-visibility corporate environment
System Design
Storage
VODA Cylinder modular tank configuration
Layout
Designed around available plant-room space and access requirements
Operations
Installed without disruption to daily building operations
Service
Maintenance access and long-term serviceability built in from day one
Outcome
  • Sustainable water reuse running quietly alongside building operations
  • Zero interference with existing building services
  • Demonstrates suitability for high-profile corporate environments where discretion and reliability are non-negotiable
04 / 12
CAPABILITY BRIEF
GMH
Green Master Harvest
VODA
MAKER OF VODA
GMH · SDN BHD
CASE STUDY 03 · INDUSTRIAL · SITE-CONSTRAINED

WASCO — Wall-Mounted Solution

When plant-room space and aesthetics ruled out ground-standing tanks entirely.

Project Context
Client
Industrial facility
Application
Rainwater harvesting for non-potable reuse
Challenge
Plant-room constraints + aesthetic and spatial requirements ruled out ground-standing VODA Cylinder tanks entirely
System Design
Solution
VODA 1 wall-mounted units throughout the facility — no Cylinder used
Trade-off
Higher unit cost per litre of storage vs. cylinder configuration — acknowledged and accepted by client
Install
Adapted to available wall surfaces and structural fixing points across the facility
Outcome
  • Fully gravity-driven RWHS achieved despite site constraints — zero pump, zero electricity
  • Gravity-first performance maintained regardless of tank format
  • GMH engineers around site realities — VODA Cylinder is the standard, wall-mounted is fully viable where constraints demand it
05 / 12
CAPABILITY BRIEF
GMH
Green Master Harvest
VODA
MAKER OF VODA
GMH · SDN BHD
A PRACTICAL ENTRY POINT TO RAINWATER HARVESTING

Phase 1 Starter Package

A defined, fixed-price rainwater harvesting starter — a proven, measurable starting point before committing to a fully engineered solution. Not for residential use. Final pricing fixed once site is confirmed.

OPTION A
Gravity-Fed System
ZERO PUMP · ZERO ELECTRICITY
RM29,600

Pure gravity configuration. The default specification where site geometry permits — lowest operating cost over the life of the system.

OPTION B
Pump-Assisted System
WHERE GEOMETRY REQUIRES LIFT
RM31,400

Gravity-first design with integrated pump where roof catchment and storage geometry require assisted delivery to end-use points.

06 / 12
CAPABILITY BRIEF
GMH
Green Master Harvest
VODA
MAKER OF VODA
GMH · SDN BHD
Phase 1 — Defined Scope

What the package includes

×9
Storage tanks, incl. first-flushModular VODA Cylinder configuration
11.3 m³
TOTAL CAPACITY
×4
VODA self-cleansing filters4-inch, no servicing interval
4-inch
NO SERVICING
×2
IoT flow metersReal-time harvest monitoring & verification
REAL-TIME
MONITORING
×1
Municipal mains backupAutomatic top-up — supply never interrupted
AUTOMATIC
TOP-UP
B
Pump systemWhere geometry requires lift to end-use points
OPTION B
ONLY
×3
Garden taps & piping allowanceDistribution to end-use points
STANDARD
SCOPE

PHYSICAL FOOTPRINT

Plant rooms, service yards, external areas.

7.8 m
3.6 m
~1m
INSTALL HEIGHT
11.3
TOTAL CAPACITY
07 / 12
CAPABILITY BRIEF
GMH
Green Master Harvest
VODA
MAKER OF VODA
GMH · SDN BHD
Commercially Measurable Returns

Projected savings & payback

/m³ As of
Design Baseline
Annual Rainfall Reference
3,000mm / yr
Roof Catchment Area
6,000sq.ft
Subject to site verification
Projected Annual Harvest
1,505,017litres
Gross Annual Water Savings
RM 5,764.21
Payback Period
OPTION A · GRAVITY OPTION B · PUMP
Gross payback 5.14YEARS 5.45YEARS
Adjusted
(after RM 500/yr maintenance)
5.62YEARS 5.96YEARS
Annual savings
(post-payback)
RM 5,764
Monthly harvest distribution Litres / month based on Peninsular average

Sub-6-year payback on a fixed-price industrial starter system.

After payback, annual savings are pure return — the system continues to perform.

IoT flow meters provide verifiable data from day one — savings are tracked, not estimated.

08 / 12
CAPABILITY BRIEF
GMH
Green Master Harvest
VODA
MAKER OF VODA
GMH · SDN BHD
From Interest to Installation

Site investigation & next steps

Two variables that determine final ROI
VAR 01
Verified roof catchment area — actual usable area confirmed on site.
VAR 02
Number of users / pax consumption — actual daily demand established.
What the site check confirms
  • RWDP locations — existing downpipe positions and tapping points
  • Tank placement — optimal positioning within available footprint
  • Gravity vs. pump — determines Option A or Option B
  • Usage points — WC connections, garden taps, irrigation outlets
  • Pipe routing — most efficient path from catchment to storage to distribution
  • Additional works — any scope beyond standard package allowance quoted separately
Post-handover: 6-month performance monitoring

GMH monitors system performance for the first 6 months after handover, using IoT flow-meter data.

Any anomalies are identified and resolved within the monitoring period.

Client receives performance data to support sustainability reporting from month one.

NEXT STEP

Phase 1 is a practical, low-risk way to start rainwater harvesting — fixed pricing, defined scope, measurable savings, and a clear path for future expansion. The next step is a site visit — no obligation, no cost, no guesswork.

09 / 12
CAPABILITY BRIEF
GMH
Green Master Harvest
VODA
MAKER OF VODA
GMH · SDN BHD
Industrial Standard · Ground-Standing

VODA Cylinder

Default Specification
VODA Cylinder

Ground-standing modular tank system. The default specification for all commercial and industrial projects — most cost-effective per litre of storage at scale. Demonstrated at MyTOWN Cheras and Wisma Shell Cyberjaya.

Format
Ground-standing modular
Range
100 L → 10,000 L per unit
Scaling
Multiple units, any site
Best for
Plant rooms · Service yards
10 / 12
CAPABILITY BRIEF
GMH
Green Master Harvest
VODA
MAKER OF VODA
GMH · SDN BHD
Site-Constrained Applications

VODA Wall-Mounted Range

FLAGSHIP · WASCO

VODA 1

300 L wall-mounted, fully gravity-driven, zero pump. Demonstrated at WASCO.

COMPACT

VODA 2

100 L unit, space-efficient, suited to constrained locations.

HIGH-DEMAND

VODA 3

Larger wall-mounted unit for higher-demand configurations.

BESPOKE

VODA EG

Engineered configuration for bespoke integration requirements.

11 / 12
CAPABILITY BRIEF
GMH
Green Master Harvest
VODA
MAKER OF VODA
GMH · SDN BHD
YOUR SYSTEM. YOUR NUMBERS. YOUR SITE.

We don't sell from a catalogue.
We derive a system from your numbers.

  • Your system is sized to your actual demand — not over-engineered, not under-built.
  • Every ringgit in the budget is justified by a corresponding ringgit in water savings over the agreed payback period.
  • Mains water remains connected as silent automatic backup — your supply is never at risk.
  • After payback, water savings become pure financial return — the system continues long after it has paid for itself.

Contact

Green Master Harvest Sdn Bhd

4th Floor, 20 Medan Stesen 18/7,
Station 18, 31650 Ipoh, Perak

PATENT MY-178044-A · CIDB REGISTERED · SPAN ENDORSED
12 / 12
CAPABILITY BRIEF